Today, in Uzhgorod, street lighting is being repaired on Raiduzhna street, 8 Bereznya st., 37-39, Odeska st., 15, Kapushanska st., 175-177. On Alexander Griboyedov street, a bus stop is being connected to the main electricity grid. A new street lighting grid is being installed on Nezalezhnist embankment.
Illegal landfills are being cleared on Onokivska, Koshitska, Potushnyak, Hrushevsky, Hodynka, General Svoboda, Lehotsky, and Shumna streets. The green zones are being mown on Pravoslavna embankment, Kyivska embankment, Hrushevsky, Lehotsky streets, cemeteries in the Radvanka and Horyany neighbourhoods.
As part of major repair on Shumna street, FEM-tile is being laid on the sidewalks. Major repairs of Sandor Petofi square are ongoing. Major repairs of roofs of residential buildings are being carried out at: Odeska st., 12 and Palay st., 1b. Major repairs are being carried out on Sobranetska street, manhole covers are being replaced, foundation is being prepared for major repairs on Odeska street (pictured). Current repairs are being carried out on Mynaiska and Clement Timiryazev streets.
Залишити відгук
You must be logged in to post a comment.