Reconstruction with the arrangement of a roundabout is being carried out at the intersection of Fedynets Street and Koryatovich Square in Uzhgorod.
The project provides for laying of granite curbs with the foundation – 40 m, granite curbs on the edge of the rumble strip – 53 m, the arrangement of the green zone in area of 88 square meters and a rumble strip in area of 88 square meters.
The total estimated cost of works, according to the design estimates, amounts to UAH 299,171 thousand, the Uzhgorod City Council reported.
Залишити відгук
You must be logged in to post a comment.