Under the pedestrian bridge, they are strengthening a cable (PHOTOS)

Under the pedestrian bridge in Uzhgorod, workers are strengthening a 10 kV cable. This work will continue for about two days. 

This was reported to Uzhgorod in. by the Deputy Mayor Yaroslav Shafar.

14 07 14 (1)

.

14 07 14 (2)

.

14 07 14 (3)

.

14 07 14 (4)

.

14 07 14

Будьте першим, додайте коментар!

Залишити відгук