Yesterday in Uzhgorod the repairs of the suspension bridge, which connects the banks of the Uzh from Bozdosh park to the Hlents street, was completed. The bridge, which was rebuilt after the floods in 1998, had not been repaired scince August 2010. Now in two days the welding works were performed and wood flooring was restored – reported in urban landscaping department.

Залишити відгук
You must be logged in to post a comment.