Yesterday morning, the police received an appeal from the deputy head of security linear control at "Dubrynichi" station, subsidiary "PrikarpatZapadtrans", stating that during the inspection of pipelines owned by JSC "South-West" near the village of Velyka Dobron of Uzhgorod district in the field 600 meters away from the settlement illegal tie-in into oil pipeline was found.
Frauds had welded the tube with one valve at a depth of 1.2 meters.
No oil leaks and threats to the environment were detected.
Залишити відгук
You must be logged in to post a comment.